1. Design Team Integration

We provide advice across the design team including:

  • Advice to the architects on the Server and Hub Room requirements to ensure an output specification and British Standard compliant rooms

  • Advice to M&E on cable zones

  • Advice to M&E on Teaching Wall layouts following client meetings and gaining an understanding of the school/Trust pedagogy and other ICT requirements

  • Advice to M&E on heat outputs within Server and Hub rooms and throughout the buildings

  • Advice to FF&E on ICT equipment location requirements

2. Draft CP's

We produce a set of fully output specification compliant DfE deliverables, including:

  • Full written response to every Design Brief/SSB requirement

  • Wireless Heat Maps

  • ICT Cost Matrix

  • ICT Equipment Schedule

  • Logical Network Diagram 

  • Cabinet Elevations

  • ICT elements of the Construction Programme

We also provide detailed advice, following engagement with the school/Trust to M&E to be able to produce:

  • Teaching Wall Layout 

  • Server and Hub Room Layouts

  • Cable runs between Server and Hub Room

We provide support and advice required for any clarifications raised.

3. CP's

We produce a set of fully output specification compliant DfE deliverables, including:

  • Full written response to every Design Brief/SSB requirement

  • Wireless Heat Maps

  • ICT Cost Matrix

  • ICT Equipment Schedule

  • Logical Network Diagram 

  • Cabinet Elevations

  • ICT elements of the Construction Programme

We also provide detailed advice, following engagement with the school/Trust to M&E to be able to produce:

  • Teaching Wall Layout 

  • Server and Hub Room Layouts

  • Cable runs between Server and Hub Room

  • Small Power and Data 1:50 

We provide support and advice required for any clarifications raised.

4. Network Design

We produce a full detailed network design document that includes:

  • Scope of Works

  • Cabinet Elevations (Front and Back including connectivity)

  • Network Topology (including all connectivity)

  • VLANs and IP Subnet Information

  • Wireless Heat Maps

  • Patching Schedule

  • Power Outputs

  • UPS/PDU Connectivity

5. Construction

We project manage the entire ICT process through the construction phase including:

  • ICT Kick Off Meeting

  • Detailed Network Design Meeting (DfE Sign Off required)

  • Decant Meeting (full coordination with the Construction Programme)

  • Server/Hub Room Readiness (DfE sign off required prior to ICT installation)

  • Teacher Wall (Sign off to ensure teaching wall principles are accurate)

  • Monthly progress reporting

  • User Acceptance Testing (DfE sign off required before building handover)

  • RAMS

6. RDD

We support through the RDD process including:

  • Any updates or clarifications required on small power and data

  • Support M&E in the production of room specific detailed teaching wall elevations

7. Broadband & Telephony

We provide all the co-ordination of the ordering (working with the

school/Trust) and installation of broadband and telephone lines

(site registration, ducting etc and installation on-site)

 

We provide OS compliant Telephone system and handsets

8. ICT Installation

We provide all OS compliant ICT /AV equipment and installation, including:

  • Core and Edge Switching

  • Wireless Access Points

  • Fly and Patch Leads

  • VoIP Telephone solutions

  • UPS

  • AV Faceplates and cable looms. AV fly leads.

  • Classroom AV equipment (Interactive and non-interactive screens)

  • Main Hall AV equipment (Lectern, speakers, screen, projector and all cabling to control points) 

All EVR personnel hold DBS, CSCS/SSSTS cards

9. Decant

We produce a full decant service including:

  • A schedule of legacy and new legacy devices

  • Condition survey's of the legacy equipment

  • Labelling of equipment to be decanted

  • Physical decant all ICT equipment (fully insured)

  • Testing on all equipment prior to decant and post decant

10. UAT's/Handover

We provide a full UAT and handover service including:

  • Full O&M Manual for all ICT solutions

  • Full training for all ICT/AV solutions

  • Full User Acceptance Tests, witnessed and signed off by the DfE

  • Full handover document to the School/Trust including configuration files and asset register

  • On-going support and warranty details

 
 
 
 
 
 
 
 
 
Server Room Layout.jpg
Teaching Wall 2.jpg
os.jpg
Cabinet Elevation Front.jpg
Cabinet Elevation Rear.jpg
Network Topology.jpg
construction.jpg
Server Room 1.jpg
5.jpg
teaching wall photo.jpg
cabling.jpg
patch sched.jpg
uat.jpg